Tuesday, November 4, 2014

Last day to work on the wood project in the wood shop during class will be November 11th.  The project will be due November 13th.  

All projects must be dry and free of fumes. This means that all painting must be completed by November 11th!

Your project must be installed in the atrium (front of art building) and ready to be critiqued.

Remember the guidelines for the project


Guidelines and Considerations: 

  • The sculpture must be “in the round”.  It may be mounted to a wall, just avoid relief.
  • The sculpture should be no smaller than 30”. 
  • The design should incorporate at least two different types of joinery.
  • The wood must be finished or treated in some way: paint, stain, sealer, shellac, wax, etc.
  • You may use more than one modular form in the composition.
  • You may alter the modular form(s) as you repeat them.  Consider variations in size, shape, or idea for a sense of gradation.
  • COLOR!

No comments:

Post a Comment